Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
0W-20 Full-Synthetic Motor Oil Blending & Pack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Kinematic Viscosity & CCS QC
20,993 < 28,000/day
Limit: downtime
Kinematic Viscosity & CCS QC: capacity 20,993/day vs demand 28,000/day. Main limit: downtime. Raw C/T 3.1 s, effective C/T 3.8 s.
Quality (RTY)
91.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€666,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4,087.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
PAO & Ester Base Pipe…
Group IV PAO & Additives
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Oil ERP
Kettle Recipe Campaign
CUSTOMER
Auto Dealerships & Re…
28,000 liters/d
Takt: 2.9 s
EDI / Daily ADR / Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
39,200
1.40 d
Drag to reorder step 1
TANK FARM
1. Simultaneous Met…
×1
Continuous Flow
C/T
1.9 s
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
42000 / 2d
OEE
93.2%
i
Insert a step here
+
I
44,800
1.60 d
Drag to reorder step 2
BLEND BAY
2. Heated Additive …
×2
Push Flow
C/T
2.4 s
C/O
45 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
33600 / 2d
OEE
86.9%
i
Insert a step here
+
I
56,000
2.00 d
AUTOMATION
In-Line B…
Drag to reorder step 3
CHEM QC LAB
3. Kinematic Viscos…
×2
BOTTLENECK
C/T
3.1 s
C/O
18 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
28000 / 1d
OEE
80.3%
i
Insert a step here
+
I
30,800
1.10 d
Drag to reorder step 4
PACK LINE
4. Rotary Blow-Fill…
×2
FIFO Lane
C/T
2.3 s
C/O
30 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
16800 / 1d
OEE
87.2%
i
FIFO
Insert a step here
+
I
25,200
0.90 d
Drag to reorder step 5
ADR DOCK
5. Foil Induction &…
×2
Continuous Flow
C/T
1.6 s
C/O
10 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
11200 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
42,000
1.50 d
Finished Goods
OUT
1.40 d
VA 1.9 s
1.60 d
VA 2.4 s
2.00 d
VA 3.1 s
1.10 d
VA 2.3 s
0.90 d
VA 1.6 s
1.50 d
Total Lead Time
8.50 d
VA Time
11 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step