Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Silicone Foul-Release Copper-Free Marine Hull
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.12 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Moisture Trace & Viscosity Lab
174 < 240/day
Limit: downtime
Moisture Trace & Viscosity Lab: capacity 174/day vs demand 240/day. Main limit: downtime. Raw C/T 4.0 min, effective C/T 5.1 min.
Quality (RTY)
88.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€360,360
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
47.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicone Polymer Prod…
Hydrogel Siloxane Resins
Weekly · LT 6d
PRODUCTION CONTROL / ERP
Process ERP
Light-to-Dark Color Wheel
CUSTOMER
Global Commercial Shi…
240 packs/d
Takt: 3.8 min
EDI / Daily ADR
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
360
1.50 d
Drag to reorder step 1
PRE-MIX
1. Moisture-Free Va…
×2
Push Flow
C/T
2.6 min
C/O
25 min
Availability
94%
Quality FPY
98.5%
Batch / EPEI
360 / 2d
OEE
90.9%
i
Insert a step here
+
I
456
1.90 d
Drag to reorder step 2
REACTOR DECK
2. Bead Mill Finene…
×2
Push Flow
C/T
3.2 min
C/O
65 min
Availability
89%
Quality FPY
97.2%
Batch / EPEI
360 / 3d
OEE
82.3%
i
Insert a step here
+
I
528
2.20 d
QUALITY
Inline Vi…
Drag to reorder step 3
QC LAB
3. Moisture Trace &…
×2
BOTTLENECK
C/T
4.0 min
C/O
20 min
Availability
84%
Quality FPY
94.5%
Batch / EPEI
240 / 1d
OEE
77.6%
i
Insert a step here
+
I
216
0.90 d
Drag to reorder step 4
FILTER SKID
4. Dry Nitrogen Dru…
×1
FIFO Lane
C/T
2.7 min
C/O
15 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
120 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
240
1.00 d
Drag to reorder step 5
FILL LINE
5. Slip-Angle Hydro…
×2
FIFO Lane
C/T
2.3 min
C/O
25 min
Availability
93%
Quality FPY
99.1%
Batch / EPEI
120 / 1d
OEE
87.0%
i
Insert a step at the end
+
I
384
1.60 d
Finished Goods
OUT
1.50 d
VA 2.6 min
1.90 d
VA 3.2 min
2.20 d
VA 4.0 min
0.90 d
VA 2.7 min
1.00 d
VA 2.3 min
1.60 d
Total Lead Time
9.12 d
VA Time
14.7 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step