Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.2 min
Lead Time (LT)
9.81 d
Value-Added
12.5 min
Efficiency (PCE)
0.09%
BottleneckCo-Current Dryer & Cooler
311 < 420/day
Limit: downtime
Quality (RTY)
90.2%
WIP Capital
€1,564,080
Carbon CO₂
282.7 t CO₂e/year