Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Carbon-Fiber PEEK Metal-Replacement Bracket
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
83 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.81 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.3 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.07%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
180°C Mold Tool High-Pressure
455 < 650/day
Limit: downtime
180°C Mold Tool High-Pressure: capacity 455/day vs demand 650/day. Main limit: downtime. Raw C/T 89 s, effective C/T 112 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€194,480
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
55.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
CF-PEEK Compound Prod…
High-Temp PEEK Granules
1x / week · LT 5d
PRODUCTION CONTROL / ERP
Molding MES
Large Campaign Mold Schedule
CUSTOMER
Aerospace & Semicon B…
650 parts/d
Takt: 83 s
EDI / Daily Truck
MRP / 1x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,040
1.60 d
Drag to reorder step 1
PREP ZONE
1. High-Temp 160°C …
×1
Continuous Flow
C/T
53 s
C/O
20 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
975 / 2d
OEE
94.0%
i
Insert a step here
+
I
1,430
2.20 d
SMED
SMED Quic…
Drag to reorder step 2
MOLDING HALL
2. 180°C Mold Tool …
×2
BOTTLENECK
C/T
89 s
C/O
95 min
Availability
82%
Quality FPY
96.5%
Batch / EPEI
1300 / 4d
OEE
75.0%
i
Insert a step here
+
I
910
1.40 d
Drag to reorder step 3
QUALITY BAY
3. Robotic Degating…
×2
Push Flow
C/T
60 s
C/O
15 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
325 / 1d
OEE
87.7%
i
Insert a step here
+
I
780
1.20 d
Drag to reorder step 4
ASSEMBLY
4. Coordinate Flatn…
×3
Push Flow
C/T
70 s
C/O
20 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
325 / 1d
OEE
85.4%
i
Insert a step here
+
I
585
0.90 d
Drag to reorder step 5
DISPATCH
5. Ultrasonic Clean…
×1
FIFO Lane
C/T
48 s
C/O
10 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
260 / 1d
OEE
93.9%
i
Insert a step at the end
+
I
975
1.50 d
Finished Goods
OUT
1.60 d
VA 53 s
2.20 d
VA 89 s
1.40 d
VA 60 s
1.20 d
VA 70 s
0.90 d
VA 48 s
1.50 d
Total Lead Time
8.81 d
VA Time
5.3 min
PCE
0.07%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step