Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Borosilicate 5.1 Neutral Pharma Glass Tube Draw
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.69 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.98%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser OD/Wall Closed-Loop
30 < 42/day
Limit: downtime
Laser OD/Wall Closed-Loop: capacity 30/day vs demand 42/day. Main limit: downtime. Raw C/T 34.4 min, effective C/T 43.2 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€846,300
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
94.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pure Quartz & Boron
Type-I Borosilicate Bat…
Daily Silo/Sand · LT 4d
PRODUCTION CONTROL / ERP
GlassMES
Continuous Furnace Campaign
CUSTOMER
Vial & Syringe Conver…
42 tonnes/d
Takt: 32.1 min
EDI / Flatbed Stillage
MRP / Daily Silo/Sand
★ PACEMAKER
IN
Insert a step at the start
+
I
67
1.60 d
Drag to reorder step 1
BATCH TOWER
1. Electric Boost T…
×1
Continuous Flow
C/T
21.9 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
63 / 2d
OEE
94.2%
i
Insert a step here
+
I
59
1.40 d
Drag to reorder step 2
HOT END
2. Rotating Mandrel…
×2
Continuous Flow
C/T
27.7 min
C/O
40 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
63 / 3d
OEE
90.9%
i
Insert a step here
+
I
92
2.19 d
GREEN
Laser Fla…
Drag to reorder step 3
THERMAL LINE
3. Laser OD/Wall Cl…
×3
BOTTLENECK
C/T
34.4 min
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
42 / 2d
OEE
77.0%
i
Insert a step here
+
I
55
1.31 d
Drag to reorder step 4
COLD END
4. Flame Cut 1.5m E…
×2
FIFO Lane
C/T
25.1 min
C/O
20 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
25 / 1d
OEE
87.7%
i
FIFO
Insert a step here
+
I
46
1.10 d
Drag to reorder step 5
STILLAGE DOCK
5. Hydrolytic USP T…
×2
FIFO Lane
C/T
19.3 min
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
21 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
84
2.00 d
Finished Goods
OUT
1.60 d
VA 21.9 min
1.40 d
VA 27.7 min
2.19 d
VA 34.4 min
1.31 d
VA 25.1 min
1.10 d
VA 19.3 min
2.00 d
Total Lead Time
9.69 d
VA Time
2.1 h
PCE
0.98%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step