Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
9-Layer EVOH Retort Spouted Stand-Up Pouch
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
0.9 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.0 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Rotogravure Solventless Lam
51,533 < 95,000/day
Limit: downtime
Rotogravure Solventless Lam: capacity 51,533/day vs demand 95,000/day. Main limit: downtime. Raw C/T 1.2 s, effective C/T 1.5 s.
Quality (RTY)
91.5%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€133,760
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
8,100.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
EVOH & PA/PE Resin Pr…
Blown PA/EVOH/PP Cast F…
1x / week · LT 5d
PRODUCTION CONTROL / ERP
FlexoMES
Large Campaign Mold Schedule
CUSTOMER
Baby Food & Sauce Bra…
95,000 packs/d
Takt: 0.9 s
EDI / Daily Truck
MRP / 1x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
152,000
1.60 d
Drag to reorder step 1
PREP ZONE
1. 9-Layer Co-Ex Bl…
×1
Continuous Flow
C/T
1.2 s
C/O
20 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
142500 / 2d
OEE
94.5%
i
Insert a step here
+
I
209,000
2.20 d
SMED
SMED Quic…
Drag to reorder step 2
MOLDING HALL
2. Rotogravure Solv…
×2
BOTTLENECK
C/T
1.2 s
C/O
95 min
Availability
82%
Quality FPY
96.5%
Batch / EPEI
190000 / 4d
OEE
76.3%
i
Insert a step here
+
I
133,000
1.40 d
Drag to reorder step 3
QUALITY BAY
3. Pouch Form & Ult…
×2
Push Flow
C/T
1.2 s
C/O
15 min
Availability
93%
Quality FPY
97.5%
Batch / EPEI
47500 / 1d
OEE
88.7%
i
Insert a step here
+
I
114,000
1.20 d
Drag to reorder step 4
ASSEMBLY
4. 100% Leak Burst …
×3
Push Flow
C/T
1.2 s
C/O
20 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
47500 / 1d
OEE
86.7%
i
Insert a step here
+
I
85,500
0.90 d
Drag to reorder step 5
DISPATCH
5. Pre-Made Boxed C…
×1
FIFO Lane
C/T
1.2 s
C/O
10 min
Availability
97%
Quality FPY
99.6%
Batch / EPEI
38000 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
142,500
1.50 d
Finished Goods
OUT
1.60 d
VA 1.2 s
2.20 d
VA 1.2 s
1.40 d
VA 1.2 s
1.20 d
VA 1.2 s
0.90 d
VA 1.2 s
1.50 d
Total Lead Time
8.80 d
VA Time
6.0 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step