Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
17 s
Lead Time (LT)
9.30 d
Value-Added
67 s
Efficiency (PCE)
0.01%
Bottleneck2-Stage Robotic Tire Building
3,475 < 4,800/day
Limit: downtime
Quality (RTY)
89.6%
WIP Capital
€1,964,160
Carbon CO₂
2,331.6 t CO₂e/year