Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
1550°C Basalt Rockwool Fire-Barrier Slab Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
9.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.63 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
38.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pendulum Fleece & Crimping
101 < 140/day
Limit: downtime
Pendulum Fleece & Crimping: capacity 101/day vs demand 140/day. Main limit: downtime. Raw C/T 10.3 min, effective C/T 13.0 min.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€833,280
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
316.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Basalt Quarry & Steel…
Volcanic Basalt Briquet…
Daily Silo/Sand · LT 4d
PRODUCTION CONTROL / ERP
Process ERP
Continuous Furnace Campaign
CUSTOMER
Cladding & Marine Fir…
140 tonnes/d
Takt: 9.6 min
EDI / Flatbed Stillage
MRP / Daily Silo/Sand
★ PACEMAKER
IN
Insert a step at the start
+
I
224
1.60 d
Drag to reorder step 1
BATCH TOWER
1. Coke/Electric Cu…
×1
Continuous Flow
C/T
6.6 min
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
210 / 2d
OEE
94.2%
i
Insert a step here
+
I
196
1.40 d
Drag to reorder step 2
HOT END
2. 4-Wheel Cascade …
×2
Continuous Flow
C/T
8.3 min
C/O
40 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
210 / 3d
OEE
90.9%
i
Insert a step here
+
I
308
2.20 d
GREEN
Laser Fla…
Drag to reorder step 3
THERMAL LINE
3. Pendulum Fleece …
×3
BOTTLENECK
C/T
10.3 min
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
140 / 2d
OEE
77.0%
i
Insert a step here
+
I
182
1.30 d
Drag to reorder step 4
COLD END
4. Phenolic Curing …
×2
FIFO Lane
C/T
7.5 min
C/O
20 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
84 / 1d
OEE
87.8%
i
FIFO
Insert a step here
+
I
154
1.10 d
Drag to reorder step 5
STILLAGE DOCK
5. Saw Trim & Hood …
×2
FIFO Lane
C/T
5.8 min
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
70 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
280
2.00 d
Finished Goods
OUT
1.60 d
VA 6.6 min
1.40 d
VA 8.3 min
2.20 d
VA 10.3 min
1.30 d
VA 7.5 min
1.10 d
VA 5.8 min
2.00 d
Total Lead Time
9.63 d
VA Time
38.5 min
PCE
0.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step