Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
9.5 min
Lead Time (LT)
8.85 d
Value-Added
36.5 min
Efficiency (PCE)
0.46%
BottleneckTri-Arm Biaxial Gas Oven
67 < 95/day
Limit: downtime
Quality (RTY)
91.5%
WIP Capital
€121,365
Carbon CO₂
8.1 t CO₂e/year