Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
EFSA Food-Contact Bottle-to-Bottle rPET Pellet
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.56 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
55.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.48%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Twin-Screw Vacuum Extrude
72 < 95/day
Limit: downtime
Twin-Screw Vacuum Extrude: capacity 72/day vs demand 95/day. Main limit: downtime. Raw C/T 15.1 min, effective C/T 18.5 min.
Quality (RTY)
91.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,067,880
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
13.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Post-Consumer Baled B…
Sorted Optical Clear PE…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
CircularERP
Kettle Recipe Campaign
CUSTOMER
Beverage Bottling Pre…
95 tonnes/d
Takt: 14.2 min
EDI / Daily ADR / Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
133
1.40 d
Drag to reorder step 1
TANK FARM
1. De-Bale, Hot Cau…
×1
Continuous Flow
C/T
9.1 min
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
143 / 2d
OEE
93.2%
i
Insert a step here
+
I
152
1.60 d
Drag to reorder step 2
BLEND BAY
2. Optical Flake La…
×2
Push Flow
C/T
11.9 min
C/O
45 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
114 / 2d
OEE
86.9%
i
Insert a step here
+
I
190
2.00 d
AUTOMATION
In-Line B…
Drag to reorder step 3
CHEM QC LAB
3. Twin-Screw Vacuu…
×2
BOTTLENECK
C/T
15.1 min
C/O
18 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
95 / 1d
OEE
80.3%
i
Insert a step here
+
I
105
1.11 d
Drag to reorder step 4
PACK LINE
4. 24h Nitrogen SSP…
×2
FIFO Lane
C/T
11.1 min
C/O
30 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
57 / 1d
OEE
87.2%
i
FIFO
Insert a step here
+
I
86
0.91 d
Drag to reorder step 5
ADR DOCK
5. Intrinsic Viscos…
×2
Continuous Flow
C/T
8.0 min
C/O
10 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
38 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
143
1.51 d
Finished Goods
OUT
1.40 d
VA 9.1 min
1.60 d
VA 11.9 min
2.00 d
VA 15.1 min
1.11 d
VA 11.1 min
0.91 d
VA 8.0 min
1.51 d
Total Lead Time
8.56 d
VA Time
55.1 min
PCE
0.48%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step