Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Braided Steel Reinforced High-Pressure Hose Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.40 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Pin-Pricked CR Outer Jacket
30 < 42/day
Limit: downtime
Pin-Pricked CR Outer Jacket: capacity 30/day vs demand 42/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 43.1 min.
Quality (RTY)
89.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€723,350
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
20.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
NBR Inner Tube & Bras…
Mandrel PVC Cores & Wire
2x / week · LT 6d
PRODUCTION CONTROL / ERP
HoseMES
Curing Cavity Batch Push
CUSTOMER
Hydraulic Crimping Pl…
42 batches/d
Takt: 32.1 min
EDI / Daily Mega-Trailer
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
76
1.81 d
Drag to reorder step 1
MIX ROOM
1. Nylon Mandrel In…
×2
Push Flow
C/T
22.5 min
C/O
35 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
63 / 2d
OEE
90.9%
i
Insert a step here
+
I
67
1.60 d
Drag to reorder step 2
COMPONENT BAY
2. 24-Spindle High-…
×2
Push Flow
C/T
27.0 min
C/O
30 min
Availability
91%
Quality FPY
97.6%
Batch / EPEI
34 / 2d
OEE
86.4%
i
Insert a step here
+
I
88
2.10 d
GREEN
Nitrogen …
Drag to reorder step 3
CURING HALL
3. Pin-Pricked CR O…
×3
BOTTLENECK
C/T
34.7 min
C/O
40 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
42 / 2d
OEE
78.1%
i
Insert a step here
+
I
46
1.10 d
Drag to reorder step 4
FINAL FINISH
4. Lead/Autoclave S…
×2
FIFO Lane
C/T
24.4 min
C/O
15 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
17 / 1d
OEE
88.6%
i
FIFO
Insert a step here
+
I
38
0.90 d
Drag to reorder step 5
TIRE DC
5. Water Impulse & …
×2
Continuous Flow
C/T
18.0 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
13 / 1d
OEE
94.6%
i
Insert a step at the end
+
I
76
1.81 d
Finished Goods
OUT
1.81 d
VA 22.5 min
1.60 d
VA 27.0 min
2.10 d
VA 34.7 min
1.10 d
VA 24.4 min
0.90 d
VA 18.0 min
1.81 d
Total Lead Time
9.40 d
VA Time
2.1 h
PCE
1.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step