Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Cold-Extracted Ascophyllum Bio-Stimulant Liquid
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
4.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
18 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.00%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Centrifuge Clarify & 50um Filt
8,701 < 12,000/day
Limit: downtime
Centrifuge Clarify & 50um Filt: capacity 8,701/day vs demand 12,000/day. Main limit: downtime. Raw C/T 4.8 s, effective C/T 6.0 s.
Quality (RTY)
90.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€493,920
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
8,078.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
North Atlantic Kelp H…
Fresh Brown Kelp Biomass
Weekly Vessel · LT 8d
PRODUCTION CONTROL / ERP
BioAgro ERP
Seasonal Formula Push
CUSTOMER
High-Value Orchard Gr…
12,000 liters/d
Takt: 4.5 s
EDI / Bulk Rail / Flatbed
MRP / Weekly Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
19,200
1.60 d
Drag to reorder step 1
WET PLANT
1. Cryo Cell-Burst …
×2
Continuous Flow
C/T
3.1 s
C/O
30 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
18000 / 2d
OEE
90.8%
i
Insert a step here
+
I
21,600
1.80 d
Drag to reorder step 2
GRANULATION
2. Cold Alkaline/En…
×2
Push Flow
C/T
3.8 s
C/O
45 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
18000 / 2d
OEE
84.7%
i
Insert a step here
+
I
24,000
2.00 d
TPM
Self-Clea…
Drag to reorder step 3
SCREEN TOWER
3. Centrifuge Clari…
×2
BOTTLENECK
C/T
4.8 s
C/O
35 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
12000 / 2d
OEE
77.3%
i
Insert a step here
+
I
12,000
1.00 d
Drag to reorder step 4
AGRO LAB
4. Organic Humic St…
×2
FIFO Lane
C/T
3.2 s
C/O
10 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
4800 / 1d
OEE
91.0%
i
FIFO
Insert a step here
+
I
14,400
1.20 d
Drag to reorder step 5
BAGGING DOCK
5. Vent-Cap HDPE 5L…
×2
FIFO Lane
C/T
2.6 s
C/O
15 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
6000 / 1d
OEE
92.2%
i
Insert a step at the end
+
I
26,400
2.20 d
Finished Goods
OUT
1.60 d
VA 3.1 s
1.80 d
VA 3.8 s
2.00 d
VA 4.8 s
1.00 d
VA 3.2 s
1.20 d
VA 2.6 s
2.20 d
Total Lead Time
9.80 d
VA Time
18 s
PCE
0.00%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step