Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
13.8 min
Lead Time (LT)
9.86 d
Value-Added
53.9 min
Efficiency (PCE)
0.61%
BottleneckFluid-Bed Quick Polymer Dry
47 < 65/day
Limit: downtime
Quality (RTY)
90.2%
WIP Capital
€1,847,300
Carbon CO₂
43.8 t CO₂e/year