Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
2.0mm Patterned Anti-Reflective Solar PV Glass
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
72 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Silica-Sol Roller AR Coating
3,231 < 4,500/day
Limit: downtime
Silica-Sol Roller AR Coating: capacity 3,231/day vs demand 4,500/day. Main limit: downtime. Raw C/T 19 s, effective C/T 24 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€604,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
10,157.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Low-Iron Silica (<100…
Silica, Soda Ash & Dolo…
Daily Silo/Sand · LT 4d
PRODUCTION CONTROL / ERP
SolarGlass MES
Continuous Furnace Campaign
CUSTOMER
Solar Module Laminato…
4,500 parts/d
Takt: 18 s
EDI / Flatbed Stillage
MRP / Daily Silo/Sand
★ PACEMAKER
IN
Insert a step at the start
+
I
7,200
1.60 d
Drag to reorder step 1
BATCH TOWER
1. Oxy-Fuel Low-Iro…
×1
Continuous Flow
C/T
12 s
C/O
20 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
6750 / 2d
OEE
94.2%
i
Insert a step here
+
I
6,300
1.40 d
Drag to reorder step 2
HOT END
2. Textured Pattern…
×2
Continuous Flow
C/T
16 s
C/O
40 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
6750 / 3d
OEE
90.9%
i
Insert a step here
+
I
9,900
2.20 d
GREEN
Laser Fla…
Drag to reorder step 3
THERMAL LINE
3. Silica-Sol Rolle…
×3
BOTTLENECK
C/T
19 s
C/O
45 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
4500 / 2d
OEE
77.0%
i
Insert a step here
+
I
5,850
1.30 d
Drag to reorder step 4
COLD END
4. 450°C Air-Quench…
×2
FIFO Lane
C/T
14 s
C/O
20 min
Availability
92%
Quality FPY
97.8%
Batch / EPEI
2700 / 1d
OEE
87.8%
i
FIFO
Insert a step here
+
I
4,950
1.10 d
Drag to reorder step 5
STILLAGE DOCK
5. Elongation & Sol…
×2
FIFO Lane
C/T
11 s
C/O
10 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
2250 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
9,000
2.00 d
Finished Goods
OUT
1.60 d
VA 12 s
1.40 d
VA 16 s
2.20 d
VA 19 s
1.30 d
VA 14 s
1.10 d
VA 11 s
2.00 d
Total Lead Time
9.60 d
VA Time
72 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step