Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Falling-Film SO3 Sulfonation SLES Surfactant
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
12.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.54 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
47.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.41%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Degas, Neutralize & Bleaching
83 < 110/day
Limit: downtime
Degas, Neutralize & Bleaching: capacity 83/day vs demand 110/day. Main limit: downtime. Raw C/T 13.0 min, effective C/T 16.0 min.
Quality (RTY)
91.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€916,300
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Oleochemical Fatty Al…
Ethoxylated C12-14 Alco…
2x / week · LT 5d
PRODUCTION CONTROL / ERP
Chemicals ERP
Kettle Recipe Campaign
CUSTOMER
Detergent & Cosmetics…
110 tonnes/d
Takt: 12.3 min
EDI / Daily ADR / Van
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
154
1.40 d
Drag to reorder step 1
TANK FARM
1. Sulfur Burn & Ca…
×1
Continuous Flow
C/T
7.9 min
C/O
20 min
Availability
95%
Quality FPY
99.1%
Batch / EPEI
165 / 2d
OEE
93.2%
i
Insert a step here
+
I
176
1.60 d
Drag to reorder step 2
BLEND BAY
2. Multi-Tube Falli…
×2
Push Flow
C/T
10.3 min
C/O
45 min
Availability
91%
Quality FPY
98.2%
Batch / EPEI
132 / 2d
OEE
86.9%
i
Insert a step here
+
I
220
2.00 d
AUTOMATION
In-Line B…
Drag to reorder step 3
CHEM QC LAB
3. Degas, Neutraliz…
×2
BOTTLENECK
C/T
13.0 min
C/O
18 min
Availability
85%
Quality FPY
95.8%
Batch / EPEI
110 / 1d
OEE
80.3%
i
Insert a step here
+
I
121
1.10 d
Drag to reorder step 4
PACK LINE
4. Dioxane <10ppm G…
×2
FIFO Lane
C/T
9.6 min
C/O
30 min
Availability
92%
Quality FPY
98.4%
Batch / EPEI
66 / 1d
OEE
87.2%
i
FIFO
Insert a step here
+
I
99
0.90 d
Drag to reorder step 5
ADR DOCK
5. Heated ISO Tanke…
×2
Continuous Flow
C/T
6.9 min
C/O
10 min
Availability
97%
Quality FPY
99.5%
Batch / EPEI
44 / 1d
OEE
94.7%
i
Insert a step at the end
+
I
165
1.50 d
Finished Goods
OUT
1.40 d
VA 7.9 min
1.60 d
VA 10.3 min
2.00 d
VA 13.0 min
1.10 d
VA 9.6 min
0.90 d
VA 6.9 min
1.50 d
Total Lead Time
8.54 d
VA Time
47.6 min
PCE
0.41%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step