Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
58 s
Lead Time (LT)
9.60 d
Value-Added
3.9 min
Efficiency (PCE)
0.03%
BottleneckConvection Furnace 680°C Quench
1,006 < 1,400/day
Limit: downtime
Quality (RTY)
89.0%
WIP Capital
€913,920
Carbon CO₂
3,160.1 t CO₂e/year