Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
32.1 min
Lead Time (LT)
8.64 d
Value-Added
2.1 h
Efficiency (PCE)
1.60%
BottleneckZeta Potential Stability Check
21 < 28/day
Limit: downtime
Quality (RTY)
91.3%
WIP Capital
€678,300
Carbon CO₂
4.1 t CO₂e/year