Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Polymer-Coated Controlled-Release Urea Prill
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
15.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.85 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.46%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Anti-Static Wax Topcoat
63 < 85/day
Limit: downtime
Anti-Static Wax Topcoat: capacity 63/day vs demand 85/day. Main limit: downtime. Raw C/T 16.8 min, effective C/T 20.9 min.
Quality (RTY)
90.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€566,440
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
57.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Prilled Granular Urea…
MDI Isocyanate & Castor…
Weekly Vessel · LT 8d
PRODUCTION CONTROL / ERP
Chemicals ERP
Seasonal Formula Push
CUSTOMER
Turf, Rice & Orchard …
85 tonnes/d
Takt: 15.9 min
EDI / Bulk Rail / Flatbed
MRP / Weekly Vessel
★ PACEMAKER
IN
Insert a step at the start
+
I
136
1.60 d
Drag to reorder step 1
WET PLANT
1. Pre-Heat 75°C Ro…
×2
Continuous Flow
C/T
10.8 min
C/O
30 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
128 / 2d
OEE
91.5%
i
Insert a step here
+
I
153
1.80 d
Drag to reorder step 2
GRANULATION
2. Multi-Spray MDI/…
×2
Push Flow
C/T
13.5 min
C/O
45 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
128 / 2d
OEE
85.7%
i
Insert a step here
+
I
170
2.00 d
TPM
Self-Clea…
Drag to reorder step 3
SCREEN TOWER
3. Anti-Static Wax …
×2
BOTTLENECK
C/T
16.8 min
C/O
35 min
Availability
84%
Quality FPY
95.8%
Batch / EPEI
85 / 2d
OEE
78.4%
i
Insert a step here
+
I
85
1.00 d
Drag to reorder step 4
AGRO LAB
4. 24h Water Leach …
×2
FIFO Lane
C/T
11.4 min
C/O
10 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
34 / 1d
OEE
91.8%
i
FIFO
Insert a step here
+
I
102
1.20 d
Drag to reorder step 5
BAGGING DOCK
5. 25kg Bag & Conta…
×2
FIFO Lane
C/T
9.2 min
C/O
15 min
Availability
96%
Quality FPY
99.3%
Batch / EPEI
43 / 1d
OEE
93.2%
i
Insert a step at the end
+
I
187
2.20 d
Finished Goods
OUT
1.60 d
VA 10.8 min
1.80 d
VA 13.5 min
2.00 d
VA 16.8 min
1.00 d
VA 11.4 min
1.20 d
VA 9.2 min
2.20 d
Total Lead Time
9.85 d
VA Time
1.0 h
PCE
0.46%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step