Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.8 min
Lead Time (LT)
9.11 d
Value-Added
11.0 min
Efficiency (PCE)
0.13%
BottleneckGrind Gauge & Specific Grav
232 < 320/day
Limit: downtime
Quality (RTY)
88.6%
WIP Capital
€364,000
Carbon CO₂
63.8 t CO₂e/year