Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Balanced Cantilever Cast-in-Situ Bridge Span
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.32 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
7.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Balanced Symmetric Concrete
4 < 6/day
Limit: downtime
Balanced Symmetric Concrete: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 2.7 h, effective C/T 3.4 h.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,508,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
31.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Travelers & Strand Ja…
Prestress Ducts & Mix
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
BridgeBIM
Weather & Concrete Pour Hold
CUSTOMER
River & Viaduct Cross…
6 cases/d
Takt: 2.5 h
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
9
1.50 d
Drag to reorder step 1
CIVIL PREP
1. Form-Traveler Ad…
×4
Push Flow
C/T
1.7 h
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
5 / 1d
OEE
88.7%
i
Insert a step here
+
I
11
1.83 d
Drag to reorder step 2
STRUCTURAL
2. Box-Girder Rebar…
×5
Push Flow
C/T
2.1 h
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
4 / 1d
OEE
83.4%
i
Insert a step here
+
I
13
2.17 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Balanced Symmetr…
×6
BOTTLENECK
C/T
2.7 h
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
3 / 1d
OEE
72.6%
i
Insert a step here
+
I
10
1.67 d
Drag to reorder step 4
CURING
4. Hydraulic Stress…
×3
FIFO Lane
C/T
2.0 h
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
3 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
5
0.83 d
Drag to reorder step 5
AS-BUILT QC
5. Camber Elevation…
×2
FIFO Lane
C/T
1.4 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
92.9%
i
Insert a step at the end
+
I
4
0.67 d
Finished Goods
OUT
1.50 d
VA 1.7 h
1.83 d
VA 2.1 h
2.17 d
VA 2.7 h
1.67 d
VA 2.0 h
0.83 d
VA 1.4 h
0.67 d
Total Lead Time
9.32 d
VA Time
9.9 h
PCE
7.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step