Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
2.8 min
Lead Time (LT)
8.51 d
Value-Added
11.1 min
Efficiency (PCE)
0.14%
BottleneckArticulated Dump Truck Cycle
215 < 320/day
Limit: downtime
Quality (RTY)
86.7%
WIP Capital
€394,400
Carbon CO₂
1,682.8 t CO₂e/year