Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
GPS Machine-Guided Highway Cut-and-Fill Haul
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.51 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.14%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Articulated Dump Truck Cycle
215 < 320/day
Limit: downtime
Articulated Dump Truck Cycle: capacity 215/day vs demand 320/day. Main limit: downtime. Raw C/T 3.0 min, effective C/T 3.8 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€394,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,682.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Borrow Pit & Quarry C…
Engineered Soil & Granu…
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
Earthworks Telematics Platform
Weather & Concrete Pour Hold
CUSTOMER
Motorway & Rail Subgr…
320 batches/d
Takt: 2.8 min
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
480
1.50 d
Drag to reorder step 1
CIVIL PREP
1. 3D Drone Cut/Fil…
×4
Push Flow
C/T
115 s
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
256 / 1d
OEE
88.6%
i
Insert a step here
+
I
576
1.80 d
Drag to reorder step 2
STRUCTURAL
2. GPS Dozer & Exca…
×5
Push Flow
C/T
2.4 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
192 / 1d
OEE
82.9%
i
Insert a step here
+
I
704
2.20 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Articulated Dump…
×6
BOTTLENECK
C/T
3.0 min
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
160 / 1d
OEE
72.6%
i
Insert a step here
+
I
512
1.60 d
Drag to reorder step 4
CURING
4. Vibratory Padfoo…
×3
FIFO Lane
C/T
2.2 min
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
160 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
256
0.80 d
Drag to reorder step 5
AS-BUILT QC
5. Plate Load Ev2 B…
×2
FIFO Lane
C/T
95 s
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
96 / 1d
OEE
92.6%
i
Insert a step at the end
+
I
192
0.60 d
Finished Goods
OUT
1.50 d
VA 115 s
1.80 d
VA 2.4 min
2.20 d
VA 3.0 min
1.60 d
VA 2.2 min
0.80 d
VA 95 s
0.60 d
Total Lead Time
8.51 d
VA Time
11.1 min
PCE
0.14%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step