Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Continuous GPS Asphalt Highway Paving Train
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.52 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
14.8 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
GPS 3D Millimeter Paver Lay
161 < 240/day
Limit: downtime
GPS 3D Millimeter Paver Lay: capacity 161/day vs demand 240/day. Main limit: downtime. Raw C/T 4.1 min, effective C/T 5.1 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€193,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,262.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hot-Mix Asphalt Plant…
160°C PMB Bitumen Aspha…
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
CivilOps 3D
Weather & Concrete Pour Hold
CUSTOMER
National Motorway Net…
240 tonnes/d
Takt: 3.8 min
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
360
1.50 d
Drag to reorder step 1
CIVIL PREP
1. Tack-Coat Emulsi…
×4
Push Flow
C/T
2.6 min
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
192 / 1d
OEE
88.6%
i
Insert a step here
+
I
432
1.80 d
Drag to reorder step 2
STRUCTURAL
2. Shuttle Buggy Ma…
×5
Push Flow
C/T
3.2 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
144 / 1d
OEE
82.9%
i
Insert a step here
+
I
528
2.20 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. GPS 3D Millimete…
×6
BOTTLENECK
C/T
4.1 min
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
120 / 1d
OEE
72.6%
i
Insert a step here
+
I
384
1.60 d
Drag to reorder step 4
CURING
4. Oscillatory + Pn…
×3
FIFO Lane
C/T
2.9 min
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
120 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
192
0.80 d
Drag to reorder step 5
AS-BUILT QC
5. Nuclear Density …
×2
FIFO Lane
C/T
2.1 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
72 / 1d
OEE
92.6%
i
Insert a step at the end
+
I
144
0.60 d
Finished Goods
OUT
1.50 d
VA 2.6 min
1.80 d
VA 3.2 min
2.20 d
VA 4.1 min
1.60 d
VA 2.9 min
0.80 d
VA 2.1 min
0.60 d
Total Lead Time
8.52 d
VA Time
14.8 min
PCE
0.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step