Automated Continuous Welded High-Speed Rail Track
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.52 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Flash-Butt Mobile Rail Weld
121 < 180/day
Limit: downtime
Flash-Butt Mobile Rail Weld: capacity 121/day vs demand 180/day. Main limit: downtime. Raw C/T 5.4 min, effective C/T 6.8 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,524,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
946.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Concrete Sleepers & 6…
250m Long Welded Rails
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
RailBuild ERP
Weather & Concrete Pour Hold
CUSTOMER
National High-Speed R…
180 batches/d
Takt: 5.0 min
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
270
1.50 d
Drag to reorder step 1
CIVIL PREP
1. Laser Graded Sub…
×4
Push Flow
C/T
3.4 min
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
144 / 1d
OEE
88.6%
i
Insert a step here
+
I
324
1.80 d
Drag to reorder step 2
STRUCTURAL
2. Track-Laying Mac…
×5
Push Flow
C/T
4.2 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
108 / 1d
OEE
82.9%
i
Insert a step here
+
I
396
2.20 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Flash-Butt Mobil…
×6
BOTTLENECK
C/T
5.4 min
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
90 / 1d
OEE
72.6%
i
Insert a step here
+
I
288
1.60 d
Drag to reorder step 4
CURING
4. Ballast Tamp & A…
×3
FIFO Lane
C/T
3.9 min
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
90 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
144
0.80 d
Drag to reorder step 5
AS-BUILT QC
5. Ultrasonic Rail …
×2
FIFO Lane
C/T
2.8 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
54 / 1d
OEE
92.6%
i
Insert a step at the end
+
I
108
0.60 d
Finished Goods
OUT
1.50 d
VA 3.4 min
1.80 d
VA 4.2 min
2.20 d
VA 5.4 min
1.60 d
VA 3.9 min
0.80 d
VA 2.8 min
0.60 d
Total Lead Time
8.52 d
VA Time
19.7 min
PCE
0.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step