Coastal Harbor Breakwater Interlocking Armor Placement
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.62 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.90%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Barge Crane Underwater Drop
15 < 24/day
Limit: changeovers
Barge Crane Underwater Drop: capacity 15/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.3 min, effective C/T 25.4 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€487,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
126.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Concrete Casting Yard
18T Interlocking Armor …
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
MarineCivil
Weather & Concrete Pour Hold
CUSTOMER
Port Breakwater Expan…
24 parts/d
Takt: 18.8 min
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
36
1.50 d
Drag to reorder step 1
CIVIL PREP
1. Geo-Textile & Co…
×4
Push Flow
C/T
12.8 min
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
19 / 1d
OEE
85.3%
i
Insert a step here
+
I
43
1.79 d
Drag to reorder step 2
STRUCTURAL
2. Multi-Beam Sonar…
×5
Push Flow
C/T
15.8 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
14 / 1d
OEE
77.8%
i
Insert a step here
+
I
53
2.21 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Barge Crane Unde…
×6
BOTTLENECK
C/T
20.3 min
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
12 / 1d
OEE
65.5%
i
Insert a step here
+
I
38
1.58 d
Drag to reorder step 4
CURING
4. 3D Sonar Interlo…
×3
FIFO Lane
C/T
14.6 min
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
12 / 1d
OEE
83.0%
i
FIFO
Insert a step here
+
I
19
0.79 d
Drag to reorder step 5
AS-BUILT QC
5. Armor Crest Conc…
×2
FIFO Lane
C/T
10.5 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
88.8%
i
Insert a step at the end
+
I
14
0.58 d
Finished Goods
OUT
1.50 d
VA 12.8 min
1.79 d
VA 15.8 min
2.21 d
VA 20.3 min
1.58 d
VA 14.6 min
0.79 d
VA 10.5 min
0.58 d
Total Lead Time
8.62 d
VA Time
1.2 h
PCE
1.90%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step