Automated GPS Solar Tracker Steel Post Driving
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
64 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.51 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.11%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hydraulic Post Ramming
256 < 420/day
Limit: changeovers
Hydraulic Post Ramming: capacity 256/day vs demand 420/day. Main limit: changeovers. Raw C/T 69 s, effective C/T 87 s.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€303,450
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2,208.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Galvanized W6x9 I-Bea…
Pre-Drilled Tracker Pil…
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
SolarCivil
Weather & Concrete Pour Hold
CUSTOMER
Utility Solar PV Parks
420 parts/d
Takt: 64 s
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
630
1.50 d
Drag to reorder step 1
CIVIL PREP
1. RTK-GPS Autonomo…
×4
Push Flow
C/T
44 s
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
336 / 1d
OEE
85.4%
i
Insert a step here
+
I
756
1.80 d
Drag to reorder step 2
STRUCTURAL
2. High-Freq Vibro …
×5
Push Flow
C/T
54 s
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
252 / 1d
OEE
78.1%
i
Insert a step here
+
I
924
2.20 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Hydraulic Post R…
×6
BOTTLENECK
C/T
69 s
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
210 / 1d
OEE
65.5%
i
Insert a step here
+
I
672
1.60 d
Drag to reorder step 4
CURING
4. Pull-Out Load Sa…
×3
FIFO Lane
C/T
50 s
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
210 / 1d
OEE
83.0%
i
FIFO
Insert a step here
+
I
336
0.80 d
Drag to reorder step 5
AS-BUILT QC
5. Cap & Torque Tub…
×2
FIFO Lane
C/T
36 s
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
126 / 1d
OEE
89.0%
i
Insert a step at the end
+
I
252
0.60 d
Finished Goods
OUT
1.50 d
VA 44 s
1.80 d
VA 54 s
2.20 d
VA 69 s
1.60 d
VA 50 s
0.80 d
VA 36 s
0.60 d
Total Lead Time
8.51 d
VA Time
4.2 min
PCE
0.11%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step