Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
64 s
Lead Time (LT)
8.51 d
Value-Added
4.2 min
Efficiency (PCE)
0.11%
BottleneckHydraulic Post Ramming
256 < 420/day
Limit: changeovers
Quality (RTY)
86.7%
WIP Capital
€303,450
Carbon CO₂
2,208.7 t CO₂e/year