Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Urban Street Embedded Acoustic Light-Rail Track
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
10.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.60 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
39.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.02%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Aluminothermic Joint Welding
27 < 45/day
Limit: changeovers
Aluminothermic Joint Welding: capacity 27/day vs demand 45/day. Main limit: changeovers. Raw C/T 10.8 min, effective C/T 13.6 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€708,550
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
236.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Polymer Track Embeddi…
59R2 Grooved Steel Rail
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
UrbanRail ERP
Weather & Concrete Pour Hold
CUSTOMER
City Public Transit A…
45 parts/d
Takt: 10.0 min
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
68
1.51 d
Drag to reorder step 1
CIVIL PREP
1. Utility Diversio…
×4
Push Flow
C/T
6.8 min
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
36 / 1d
OEE
85.4%
i
Insert a step here
+
I
81
1.80 d
Drag to reorder step 2
STRUCTURAL
2. Polymer Elastome…
×5
Push Flow
C/T
8.4 min
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
27 / 1d
OEE
78.1%
i
Insert a step here
+
I
99
2.20 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Aluminothermic J…
×6
BOTTLENECK
C/T
10.8 min
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
23 / 1d
OEE
65.8%
i
Insert a step here
+
I
72
1.60 d
Drag to reorder step 4
CURING
4. Asphalt Wear Cou…
×3
FIFO Lane
C/T
7.8 min
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
23 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
36
0.80 d
Drag to reorder step 5
AS-BUILT QC
5. Bogie Clearance …
×2
FIFO Lane
C/T
5.6 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
14 / 1d
OEE
89.3%
i
Insert a step at the end
+
I
27
0.60 d
Finished Goods
OUT
1.51 d
VA 6.8 min
1.80 d
VA 8.4 min
2.20 d
VA 10.8 min
1.60 d
VA 7.8 min
0.80 d
VA 5.6 min
0.60 d
Total Lead Time
8.60 d
VA Time
39.4 min
PCE
1.02%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step