10m Slurry TBM Metro Tunnel Advance & Ring Cycle
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.83 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.72%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Erector Arm Gasketed Ring Set
8 < 12/day
Limit: downtime
Erector Arm Gasketed Ring Set: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.5 h.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,448,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
63.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Precast Segment Yard
6+1 Key Concrete Tunnel…
Daily Batch Mix · LT 2d
PRODUCTION CONTROL / ERP
TunnelBIM
Weather & Concrete Pour Hold
CUSTOMER
Metropolitan Transit …
12 cases/d
Takt: 1.9 h
EDI / Milestone Handover
MRP / Daily Batch Mix
★ PACEMAKER
IN
Insert a step at the start
+
I
18
1.50 d
Drag to reorder step 1
CIVIL PREP
1. TBM Cutterhead S…
×4
Push Flow
C/T
1.3 h
C/O
25 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
10 / 1d
OEE
89.7%
i
Insert a step here
+
I
22
1.83 d
Drag to reorder step 2
STRUCTURAL
2. Muck Slurry Trea…
×5
Push Flow
C/T
1.6 h
C/O
30 min
Availability
91%
Quality FPY
96.5%
Batch / EPEI
7 / 1d
OEE
84.5%
i
Insert a step here
+
I
26
2.17 d
AUTOMATION
Self-Comp…
Drag to reorder step 3
CRITICAL PATH
3. Erector Arm Gask…
×6
BOTTLENECK
C/T
2.0 h
C/O
40 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
6 / 1d
OEE
74.9%
i
Insert a step here
+
I
19
1.58 d
Drag to reorder step 4
CURING
4. Two-Part Annulus…
×3
FIFO Lane
C/T
1.5 h
C/O
20 min
Availability
93%
Quality FPY
98.0%
Batch / EPEI
6 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
10
0.83 d
Drag to reorder step 5
AS-BUILT QC
5. Laser Guidance A…
×2
FIFO Lane
C/T
1.1 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
7
0.58 d
Finished Goods
OUT
1.50 d
VA 1.3 h
1.83 d
VA 1.6 h
2.17 d
VA 2.0 h
1.58 d
VA 1.5 h
0.83 d
VA 1.1 h
0.58 d
Total Lead Time
8.83 d
VA Time
7.4 h
PCE
3.72%