Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Pressurized Ethylene Banana Ripening Cold Rooms
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
39 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.30 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.05%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
72h Gas-Tight Ethylene Chamber
1,052 < 1,400/day
Limit: downtime
72h Gas-Tight Ethylene Chamber: capacity 1,052/day vs demand 1,400/day. Main limit: downtime. Raw C/T 41 s, effective C/T 50 s.
Quality (RTY)
89.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€178,080
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
357.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Tropical Reefer Vesse…
Green 13°C Banana Palle…
Daily · LT 2d
PRODUCTION CONTROL / ERP
FreshWMS
Manual GDP Quarantine Hold
CUSTOMER
Supermarket Produce D…
1,400 crates/d
Takt: 39 s
EDI / 2x / day FEFO
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
980
0.70 d
Drag to reorder step 1
COLD INBOUND
1. Pulp Core Probe …
×3
FIFO Lane
C/T
27 s
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
560 / 1d
OEE
92.2%
i
FIFO
Insert a step here
+
I
1,960
1.40 d
AUTOMATION
Cloud IoT…
Drag to reorder step 2
GDP QUALITY
2. 72h Gas-Tight Et…
×2
BOTTLENECK
C/T
41 s
C/O
15 min
Availability
87%
Quality FPY
95.0%
Batch / EPEI
700 / 1d
OEE
79.9%
i
Insert a step here
+
E
1,680
1.20 d
Drag to reorder step 3
2°C STORE
3. Forced-Air Color…
×3
Kanban Pull
C/T
29 s
C/O
8 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
420 / 1d
OEE
89.8%
i
KANBAN
Insert a step here
+
I
1,120
0.80 d
Drag to reorder step 4
PICK AISLE
4. Split-Case Crate…
×5
FIFO Lane
C/T
33 s
C/O
8 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
280 / 1d
OEE
85.8%
i
FIFO
Insert a step here
+
I
700
0.50 d
Drag to reorder step 5
COLD OUTBOUND
5. 14°C Breathable …
×3
Continuous Flow
C/T
22 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
350 / 1d
OEE
90.9%
i
Insert a step at the end
+
I
980
0.70 d
Finished Goods
OUT
0.70 d
VA 27 s
1.40 d
VA 41 s
1.20 d
VA 29 s
0.80 d
VA 33 s
0.50 d
VA 22 s
0.70 d
Total Lead Time
5.30 d
VA Time
2.5 min
PCE
0.05%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen