Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Global Clinical Trial Frozen Biopsy Courier Hub
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.31 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Customs Bio-Permit Clear
313 < 420/day
Limit: downtime
Customs Bio-Permit Clear: capacity 313/day vs demand 420/day. Main limit: downtime. Raw C/T 2.3 min, effective C/T 2.8 min.
Quality (RTY)
89.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€244,860
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
107.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hospital Investigator…
UN3373 Bio-Samples
Daily · LT 2d
PRODUCTION CONTROL / ERP
BioLogistics MES
Manual GDP Quarantine Hold
CUSTOMER
Central Bio-Analytica…
420 samples/d
Takt: 2.1 min
EDI / 2x / day FEFO
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
294
0.70 d
Drag to reorder step 1
COLD INBOUND
1. UN3373 Triple-Pa…
×3
FIFO Lane
C/T
90 s
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
168 / 1d
OEE
92.2%
i
FIFO
Insert a step here
+
I
588
1.40 d
AUTOMATION
Cloud IoT…
Drag to reorder step 2
GDP QUALITY
2. Customs Bio-Perm…
×2
BOTTLENECK
C/T
2.3 min
C/O
15 min
Availability
87%
Quality FPY
95.0%
Batch / EPEI
210 / 1d
OEE
79.9%
i
Insert a step here
+
E
504
1.20 d
Drag to reorder step 3
2°C STORE
3. Automated Dry-Ic…
×3
Kanban Pull
C/T
98 s
C/O
8 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
126 / 1d
OEE
89.8%
i
KANBAN
Insert a step here
+
I
336
0.80 d
Drag to reorder step 4
PICK AISLE
4. Chain-of-Custody…
×5
FIFO Lane
C/T
111 s
C/O
8 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
84 / 1d
OEE
85.8%
i
FIFO
Insert a step here
+
I
210
0.50 d
Drag to reorder step 5
COLD OUTBOUND
5. Lab-Door Cryo Ha…
×3
Continuous Flow
C/T
75 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
105 / 1d
OEE
90.9%
i
Insert a step at the end
+
I
294
0.70 d
Finished Goods
OUT
0.70 d
VA 90 s
1.40 d
VA 2.3 min
1.20 d
VA 98 s
0.80 d
VA 111 s
0.50 d
VA 75 s
0.70 d
Total Lead Time
5.31 d
VA Time
8.5 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step