Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
-25°C Automated Clad-Rack Deep-Freeze Hub
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
37 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
5.30 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.03%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
40m Stacker Crane Putaway
1,661 < 2,200/day
Limit: downtime
40m Stacker Crane Putaway: capacity 1,661/day vs demand 2,200/day. Main limit: downtime. Raw C/T 39 s, effective C/T 48 s.
Quality (RTY)
89.3%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€326,480
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
561.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Frozen Bakery & Fries…
Blast-Frozen Master Pal…
Daily · LT 2d
PRODUCTION CONTROL / ERP
Warehouse ERP Cold
Manual GDP Quarantine Hold
CUSTOMER
National Grocery DCs
2,200 crates/d
Takt: 37 s
EDI / 2x / day FEFO
MRP / Daily
★ PACEMAKER
IN
Insert a step at the start
+
I
1,540
0.70 d
Drag to reorder step 1
COLD INBOUND
1. -25°C Conveyor A…
×3
FIFO Lane
C/T
26 s
C/O
10 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
880 / 1d
OEE
93.1%
i
FIFO
Insert a step here
+
I
3,080
1.40 d
AUTOMATION
Cloud IoT…
Drag to reorder step 2
GDP QUALITY
2. 40m Stacker Cran…
×2
BOTTLENECK
C/T
39 s
C/O
15 min
Availability
87%
Quality FPY
95.0%
Batch / EPEI
1100 / 1d
OEE
80.8%
i
Insert a step here
+
E
2,640
1.20 d
Drag to reorder step 3
2°C STORE
3. Robotic Layer-Pi…
×3
Kanban Pull
C/T
28 s
C/O
8 min
Availability
94%
Quality FPY
98.4%
Batch / EPEI
660 / 1d
OEE
90.7%
i
KANBAN
Insert a step here
+
I
1,760
0.80 d
Drag to reorder step 4
PICK AISLE
4. Stretch-Wrap Fre…
×5
FIFO Lane
C/T
32 s
C/O
8 min
Availability
92%
Quality FPY
97.6%
Batch / EPEI
440 / 1d
OEE
87.1%
i
FIFO
Insert a step here
+
I
1,100
0.50 d
Drag to reorder step 5
COLD OUTBOUND
5. Pre-Cooled Reefe…
×3
Continuous Flow
C/T
21 s
C/O
10 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
550 / 1d
OEE
92.3%
i
Insert a step at the end
+
I
1,540
0.70 d
Finished Goods
OUT
0.70 d
VA 26 s
1.40 d
VA 39 s
1.20 d
VA 28 s
0.80 d
VA 32 s
0.50 d
VA 21 s
0.70 d
Total Lead Time
5.30 d
VA Time
2.4 min
PCE
0.03%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step