Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.2 min
Lead Time (LT)
5.31 d
Value-Added
12.8 min
Efficiency (PCE)
0.27%
BottleneckNational Walk-In Cold Store
209 < 280/day
Limit: downtime
Quality (RTY)
89.3%
WIP Capital
€267,120
Carbon CO₂
71.5 t CO₂e/year