Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
26.5 min
Lead Time (LT)
8.11 d
Value-Added
1.7 h
Efficiency (PCE)
1.41%
BottleneckSolar Tunnel Dry to 7% Moist
24 < 34/day
Limit: downtime
Quality (RTY)
88.7%
WIP Capital
€652,800
Carbon CO₂
13.9 t CO₂e/year