Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
14.2 min
Lead Time (LT)
8.06 d
Value-Added
55.3 min
Efficiency (PCE)
0.51%
BottleneckHigh-Speed Ribbed Saw Ginning
69 < 95/day
Limit: downtime
Quality (RTY)
88.7%
WIP Capital
€1,104,900
Carbon CO₂
39.0 t CO₂e/year