Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Mobile-Bin Copper Steam Lavender Essential Oil
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.1 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.28 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.36%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Gooseneck Condense & Florentine
10 < 14/day
Limit: downtime
Gooseneck Condense & Florentine: capacity 10/day vs demand 14/day. Main limit: downtime. Raw C/T 1.1 h, effective C/T 1.4 h.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€184,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
5.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Harvested Field Chopp…
Withered Flowering Lave…
Daily Harvest Deliveries · LT 1d
PRODUCTION CONTROL / ERP
AromaERP
Drying Patio Weather Hold
CUSTOMER
Grasse Perfumery Hous…
14 batches/d
Takt: 1.1 h
EDI / Export Bulk/Bag
MRP / Daily Harvest Deliveries
★ PACEMAKER
IN
Insert a step at the start
+
I
13
0.93 d
Drag to reorder step 1
FIELD WEIGH
1. Chopper Harvest …
×3
FIFO Lane
C/T
43.7 min
C/O
12 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
7 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
21
1.50 d
Drag to reorder step 2
WET MILL
2. Sealed Steam-Inj…
×3
Push Flow
C/T
54.0 min
C/O
20 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
8 / 1d
OEE
84.9%
i
Insert a step here
+
I
28
2.00 d
GREEN
Biomass C…
Drag to reorder step 3
DRY MILL
3. Gooseneck Conden…
×2
BOTTLENECK
C/T
1.1 h
C/O
35 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
11 / 2d
OEE
76.2%
i
Insert a step here
+
I
15
1.07 d
Drag to reorder step 4
DRY SORT
4. Dehydrate & GC-M…
×2
FIFO Lane
C/T
47.6 min
C/O
15 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
6 / 1d
OEE
87.7%
i
FIFO
Insert a step here
+
I
14
1.00 d
Drag to reorder step 5
EXPORT SILO
5. Nitrogen Aluminu…
×2
FIFO Lane
C/T
36.0 min
C/O
10 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
4 / 1d
OEE
92.6%
i
Insert a step at the end
+
I
21
1.50 d
Finished Goods
OUT
0.93 d
VA 43.7 min
1.50 d
VA 54.0 min
2.00 d
VA 1.1 h
1.07 d
VA 47.6 min
1.00 d
VA 36.0 min
1.50 d
Total Lead Time
8.28 d
VA Time
4.2 h
PCE
3.36%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step