Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Pasteurized Tunnel Substrate & Fresh Button Harvest
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.01 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.13%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
3-Flush Selective Hand Pick
271 < 380/day
Limit: downtime
3-Flush Selective Hand Pick: capacity 271/day vs demand 380/day. Main limit: downtime. Raw C/T 2.5 min, effective C/T 3.2 min.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€42,560
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
155.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Wheat Straw & Chicken…
Spawn-Inoculated Compos…
Daily Harvest Deliveries · LT 1d
PRODUCTION CONTROL / ERP
FungiERP
Drying Patio Weather Hold
CUSTOMER
Supermarket Produce D…
380 crates/d
Takt: 2.4 min
EDI / Export Bulk/Bag
MRP / Daily Harvest Deliveries
★ PACEMAKER
IN
Insert a step at the start
+
I
342
0.90 d
Drag to reorder step 1
FIELD WEIGH
1. 2-Phase Tunnel C…
×3
FIFO Lane
C/T
97 s
C/O
12 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
190 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
570
1.50 d
Drag to reorder step 2
WET MILL
2. Climate Shelf Ca…
×3
Push Flow
C/T
119 s
C/O
20 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
228 / 1d
OEE
85.1%
i
Insert a step here
+
I
760
2.00 d
GREEN
Biomass C…
Drag to reorder step 3
DRY MILL
3. 3-Flush Selectiv…
×2
BOTTLENECK
C/T
2.5 min
C/O
35 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
304 / 2d
OEE
76.3%
i
Insert a step here
+
I
418
1.10 d
Drag to reorder step 4
DRY SORT
4. Instant 2°C Vacu…
×2
FIFO Lane
C/T
105 s
C/O
15 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
152 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
380
1.00 d
Drag to reorder step 5
EXPORT SILO
5. Blue Tray Film W…
×2
FIFO Lane
C/T
80 s
C/O
10 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
114 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
570
1.50 d
Finished Goods
OUT
0.90 d
VA 97 s
1.50 d
VA 119 s
2.00 d
VA 2.5 min
1.10 d
VA 105 s
1.00 d
VA 80 s
1.50 d
Total Lead Time
8.01 d
VA Time
9.2 min
PCE
0.13%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step