Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Hevea Natural Rubber RSS3 Smoked Sheet Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.09 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
53.9 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.74%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
4-Day Biomass Smoke House
46 < 65/day
Limit: downtime
4-Day Biomass Smoke House: capacity 46/day vs demand 65/day. Main limit: downtime. Raw C/T 14.8 min, effective C/T 18.5 min.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€756,900
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
26.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Smallholder Latex Fie…
Ammonia-Free Fresh Fiel…
Daily Harvest Deliveries · LT 1d
PRODUCTION CONTROL / ERP
NatRubber ERP
Drying Patio Weather Hold
CUSTOMER
Radial Tire Factories
65 tonnes/d
Takt: 13.8 min
EDI / Export Bulk/Bag
MRP / Daily Harvest Deliveries
★ PACEMAKER
IN
Insert a step at the start
+
I
59
0.91 d
Drag to reorder step 1
FIELD WEIGH
1. Sieve Filter & F…
×3
FIFO Lane
C/T
9.4 min
C/O
12 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
33 / 1d
OEE
89.9%
i
FIFO
Insert a step here
+
I
98
1.51 d
Drag to reorder step 2
WET MILL
2. 6-Pair Mangle Sq…
×3
Push Flow
C/T
11.6 min
C/O
20 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
39 / 1d
OEE
85.1%
i
Insert a step here
+
I
130
2.00 d
GREEN
Biomass C…
Drag to reorder step 3
DRY MILL
3. 4-Day Biomass Sm…
×2
BOTTLENECK
C/T
14.8 min
C/O
35 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
52 / 2d
OEE
76.3%
i
Insert a step here
+
I
72
1.11 d
Drag to reorder step 4
DRY SORT
4. Visual Defect Gr…
×2
FIFO Lane
C/T
10.3 min
C/O
15 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
26 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
65
1.00 d
Drag to reorder step 5
EXPORT SILO
5. 35kg Bale Press …
×2
FIFO Lane
C/T
7.8 min
C/O
10 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
20 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
98
1.51 d
Finished Goods
OUT
0.91 d
VA 9.4 min
1.51 d
VA 11.6 min
2.00 d
VA 14.8 min
1.11 d
VA 10.3 min
1.00 d
VA 7.8 min
1.51 d
Total Lead Time
8.09 d
VA Time
53.9 min
PCE
0.74%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step