Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Grown Leaf Withering, Rolling & Orthodox Tea
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
40.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.18 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Humid 26°C Copper Ferment
16 < 22/day
Limit: downtime
Humid 26°C Copper Ferment: capacity 16/day vs demand 22/day. Main limit: downtime. Raw C/T 43.8 min, effective C/T 54.6 min.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€492,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
9.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Plucking Estate Baske…
Fresh Two-Leaves-and-a-…
Daily Harvest Deliveries · LT 1d
PRODUCTION CONTROL / ERP
TeaEstate ERP
Drying Patio Weather Hold
CUSTOMER
Global Tea Blenders
22 tonnes/d
Takt: 40.9 min
EDI / Export Bulk/Bag
MRP / Daily Harvest Deliveries
★ PACEMAKER
IN
Insert a step at the start
+
I
20
0.91 d
Drag to reorder step 1
FIELD WEIGH
1. Air Trough 14h M…
×3
FIFO Lane
C/T
27.8 min
C/O
12 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
11 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
33
1.50 d
Drag to reorder step 2
WET MILL
2. 30-Min Orthodox …
×3
Push Flow
C/T
34.4 min
C/O
20 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
13 / 1d
OEE
85.0%
i
Insert a step here
+
I
44
2.00 d
GREEN
Biomass C…
Drag to reorder step 3
DRY MILL
3. Humid 26°C Coppe…
×2
BOTTLENECK
C/T
43.8 min
C/O
35 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
18 / 2d
OEE
76.4%
i
Insert a step here
+
I
24
1.09 d
Drag to reorder step 4
DRY SORT
4. Fluid-Bed Dryer …
×2
FIFO Lane
C/T
30.3 min
C/O
15 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
9 / 1d
OEE
87.5%
i
FIFO
Insert a step here
+
I
22
1.00 d
Drag to reorder step 5
EXPORT SILO
5. Sieve Grade & Fo…
×2
FIFO Lane
C/T
22.9 min
C/O
10 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
7 / 1d
OEE
93.0%
i
Insert a step at the end
+
I
33
1.50 d
Finished Goods
OUT
0.91 d
VA 27.8 min
1.50 d
VA 34.4 min
2.00 d
VA 43.8 min
1.09 d
VA 30.3 min
1.00 d
VA 22.9 min
1.50 d
Total Lead Time
8.18 d
VA Time
2.7 h
PCE
2.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step