Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
CTL Cut-to-Length Forest Harvester & Forwarder
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
8.01 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
13.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
8WD Forwarder Extraction Haul
186 < 260/day
Limit: downtime
8WD Forwarder Extraction Haul: capacity 186/day vs demand 260/day. Main limit: downtime. Raw C/T 3.7 min, effective C/T 4.6 min.
Quality (RTY)
88.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€135,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
106.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Certified Pine Stands
Standing Mature Pine Tr…
Daily Harvest Deliveries · LT 1d
PRODUCTION CONTROL / ERP
Forest Mapping ERP
Drying Patio Weather Hold
CUSTOMER
Sawmills & Pulp Plants
260 tonnes/d
Takt: 3.5 min
EDI / Export Bulk/Bag
MRP / Daily Harvest Deliveries
★ PACEMAKER
IN
Insert a step at the start
+
I
234
0.90 d
Drag to reorder step 1
FIELD WEIGH
1. GPS Harvester Fe…
×3
FIFO Lane
C/T
2.4 min
C/O
12 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
130 / 1d
OEE
89.8%
i
FIFO
Insert a step here
+
I
390
1.50 d
Drag to reorder step 2
WET MILL
2. Laser Diameter L…
×3
Push Flow
C/T
2.9 min
C/O
20 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
156 / 1d
OEE
85.1%
i
Insert a step here
+
I
520
2.00 d
GREEN
Biomass C…
Drag to reorder step 3
DRY MILL
3. 8WD Forwarder Ex…
×2
BOTTLENECK
C/T
3.7 min
C/O
35 min
Availability
84%
Quality FPY
95.5%
Batch / EPEI
208 / 2d
OEE
76.3%
i
Insert a step here
+
I
286
1.10 d
Drag to reorder step 4
DRY SORT
4. Roadside Stack &…
×2
FIFO Lane
C/T
2.6 min
C/O
15 min
Availability
93%
Quality FPY
98.1%
Batch / EPEI
104 / 1d
OEE
87.4%
i
FIFO
Insert a step here
+
I
260
1.00 d
Drag to reorder step 5
EXPORT SILO
5. Timber Truck Cra…
×2
FIFO Lane
C/T
116 s
C/O
10 min
Availability
97%
Quality FPY
99.3%
Batch / EPEI
78 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
390
1.50 d
Finished Goods
OUT
0.90 d
VA 2.4 min
1.50 d
VA 2.9 min
2.00 d
VA 3.7 min
1.10 d
VA 2.6 min
1.00 d
VA 116 s
1.50 d
Total Lead Time
8.01 d
VA Time
13.5 min
PCE
0.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step