Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Frameless Acoustic Office Glass Partitioning
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
11.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.18 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
44.2 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.59%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vacuum Lifter Pane Placement
24 < 38/day
Limit: changeovers
Vacuum Lifter Pane Placement: capacity 24/day vs demand 38/day. Main limit: changeovers. Raw C/T 12.7 min, effective C/T 15.9 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€170,940
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
17.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Laminated 46dB Glass …
Black Anodized Slim Cha…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
InteriorERP
Trade Stacking Clash Delays
CUSTOMER
Corporate HQ Fit-Outs
38 rooms/d
Takt: 11.8 min
EDI / Floor Turnkey
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
38
1.00 d
Drag to reorder step 1
STAGING ZONE
1. Laser Plumb Floo…
×2
FIFO Lane
C/T
7.4 min
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
15 / 1d
OEE
89.1%
i
FIFO
Insert a step here
+
I
49
1.29 d
Drag to reorder step 2
FIRST FIX
2. Acoustic Foam & …
×4
Push Flow
C/T
9.2 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
11 / 1d
OEE
82.4%
i
Insert a step here
+
I
68
1.79 d
BALANCING
Pull Takt…
Drag to reorder step 3
ZONE TAKT
3. Vacuum Lifter Pa…
×5
BOTTLENECK
C/T
12.7 min
C/O
20 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
11 / 1d
OEE
67.5%
i
Insert a step here
+
I
34
0.89 d
Drag to reorder step 4
TRADE TEST
4. Full-Height Door…
×2
FIFO Lane
C/T
8.8 min
C/O
8 min
Availability
95%
Quality FPY
97.4%
Batch / EPEI
8 / 1d
OEE
84.7%
i
FIFO
Insert a step here
+
I
19
0.50 d
Drag to reorder step 5
HANDOVER
5. Joint Silicone &…
×2
Continuous Flow
C/T
6.2 min
C/O
5 min
Availability
97%
Quality FPY
98.8%
Batch / EPEI
6 / 1d
OEE
89.1%
i
Insert a step at the end
+
I
23
0.61 d
Finished Goods
OUT
1.00 d
VA 7.4 min
1.29 d
VA 9.2 min
1.79 d
VA 12.7 min
0.89 d
VA 8.8 min
0.50 d
VA 6.2 min
0.61 d
Total Lead Time
6.18 d
VA Time
44.2 min
PCE
1.59%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step