Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
45m Precast Prestressed Concrete Bridge Girder
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.63 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
8.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Self-Consolidate Concrete Pour
4 < 6/day
Limit: downtime
Self-Consolidate Concrete Pour: capacity 4/day vs demand 6/day. Main limit: downtime. Raw C/T 2.7 h, effective C/T 3.3 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€386,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
17.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Low-Carbon Cement & S…
1860MPa Strand & C50 Co…
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
PrecastERP
Project Job-Shop Push
CUSTOMER
Highway DOT Bridges
6 parts/d
Takt: 2.5 h
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
8
1.33 d
Drag to reorder step 1
BAY 1 FRAME
1. Strand Tension J…
×4
Push Flow
C/T
1.6 h
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
5 / 2d
OEE
87.1%
i
Insert a step here
+
I
7
1.17 d
Drag to reorder step 2
BAY 2 SHELL
2. Automated Cage &…
×4
Push Flow
C/T
1.8 h
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
3 / 1d
OEE
87.7%
i
Insert a step here
+
I
12
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. Self-Consolidate…
×5
BOTTLENECK
C/T
2.7 h
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
2 / 1d
OEE
72.0%
i
Insert a step here
+
I
6
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Steam Curing & S…
×4
FIFO Lane
C/T
2.0 h
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
2 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
4
0.67 d
Drag to reorder step 5
DISPATCH YARD
5. Cam-Check & Heav…
×2
FIFO Lane
C/T
1.4 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
92.9%
i
Insert a step at the end
+
I
5
0.83 d
Finished Goods
OUT
1.33 d
VA 1.6 h
1.17 d
VA 1.8 h
2.00 d
VA 2.7 h
1.00 d
VA 2.0 h
0.67 d
VA 1.4 h
0.83 d
Total Lead Time
7.63 d
VA Time
9.5 h
PCE
8.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step