Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Bio-Pharma Cleanroom Stainless Exhaust Ducting
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.36 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.67%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
HEPA Terminal Box Drop
10 < 16/day
Limit: changeovers
HEPA Terminal Box Drop: capacity 10/day vs demand 16/day. Main limit: changeovers. Raw C/T 30.1 min, effective C/T 37.8 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€313,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
7.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Prefab Orbital SS Duc…
316L & Gasketed Flange …
2x / week · LT 4d
PRODUCTION CONTROL / ERP
CleanBuild MES
Trade Stacking Clash Delays
CUSTOMER
Pharma CapEx Contract…
16 rooms/d
Takt: 28.1 min
EDI / Floor Turnkey
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
16
1.00 d
Drag to reorder step 1
STAGING ZONE
1. Hanger Rod & Str…
×2
FIFO Lane
C/T
17.4 min
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
6 / 1d
OEE
88.9%
i
FIFO
Insert a step here
+
I
21
1.31 d
Drag to reorder step 2
FIRST FIX
2. Spool Bolt-Up & …
×4
Push Flow
C/T
21.9 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
5 / 1d
OEE
83.0%
i
Insert a step here
+
I
29
1.81 d
BALANCING
Pull Takt…
Drag to reorder step 3
ZONE TAKT
3. HEPA Terminal Bo…
×5
BOTTLENECK
C/T
30.1 min
C/O
20 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
5 / 1d
OEE
68.4%
i
Insert a step here
+
I
14
0.88 d
Drag to reorder step 4
TRADE TEST
4. SMACNA Pressure …
×2
FIFO Lane
C/T
20.8 min
C/O
8 min
Availability
95%
Quality FPY
97.4%
Batch / EPEI
3 / 1d
OEE
83.8%
i
FIFO
Insert a step here
+
I
8
0.50 d
Drag to reorder step 5
HANDOVER
5. DOP Aerosol Filt…
×2
Continuous Flow
C/T
14.6 min
C/O
5 min
Availability
97%
Quality FPY
98.8%
Batch / EPEI
2 / 1d
OEE
87.3%
i
Insert a step at the end
+
I
10
0.63 d
Finished Goods
OUT
1.00 d
VA 17.4 min
1.31 d
VA 21.9 min
1.81 d
VA 30.1 min
0.88 d
VA 20.8 min
0.50 d
VA 14.6 min
0.63 d
Total Lead Time
6.36 d
VA Time
1.7 h
PCE
3.67%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step