Turnkey BSL-3 / GMP Modular Cleanroom Pod
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.95 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
11.89%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
HEPA Ceiling & DDC Controls
3 < 4/day
Limit: changeovers
HEPA Ceiling & DDC Controls: capacity 3/day vs demand 4/day. Main limit: changeovers. Raw C/T 2.0 h, effective C/T 2.5 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€616,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
HEPA Filter & HPL Wal…
Stainless Pass-Thru & A…
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
CleanBuild ERP
Project Job-Shop Push
CUSTOMER
Biotech & Cell Therap…
4 modules/d
Takt: 1.9 h
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.50 d
Drag to reorder step 1
BAY 1 FRAME
1. Steel Chassis & …
×4
Push Flow
C/T
1.2 h
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
3 / 2d
OEE
81.9%
i
Insert a step here
+
I
5
1.25 d
Drag to reorder step 2
BAY 2 SHELL
2. Flush GMP Wall &…
×4
Push Flow
C/T
1.4 h
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
83.6%
i
Insert a step here
+
I
8
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. HEPA Ceiling & D…
×5
BOTTLENECK
C/T
2.0 h
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
2 / 1d
OEE
69.3%
i
Insert a step here
+
I
4
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Smoke Pattern & …
×4
FIFO Lane
C/T
1.5 h
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
1 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
2
0.50 d
Drag to reorder step 5
DISPATCH YARD
5. Air-Tight Ship W…
×2
FIFO Lane
C/T
1.0 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
94.0%
i
Insert a step at the end
+
I
3
0.75 d
Finished Goods
OUT
1.50 d
VA 1.2 h
1.25 d
VA 1.4 h
2.00 d
VA 2.0 h
1.00 d
VA 1.5 h
0.50 d
VA 1.0 h
0.75 d
Total Lead Time
7.95 d
VA Time
7.1 h
PCE
11.89%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step