Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
10m/s Gearless High-Rise Elevator Shaft Install
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.79 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
9.16%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Overhead PM Machine & Cables
4 < 6/day
Limit: changeovers
Overhead PM Machine & Cables: capacity 4/day vs demand 6/day. Main limit: changeovers. Raw C/T 1.3 h, effective C/T 1.7 h.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€684,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Lift Hoist Kits
Guide Rails, Machines &…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
Lift Installation ERP
Trade Stacking Clash Delays
CUSTOMER
40-Story Residential …
6 units/d
Takt: 1.3 h
EDI / Floor Turnkey
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.00 d
Drag to reorder step 1
STAGING ZONE
1. Laser Plumb Shaf…
×2
FIFO Lane
C/T
46.5 min
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
2 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
8
1.33 d
Drag to reorder step 2
FIRST FIX
2. Guide Rail & Cou…
×4
Push Flow
C/T
58.5 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
2 / 1d
OEE
83.5%
i
Insert a step here
+
I
11
1.83 d
BALANCING
Pull Takt…
Drag to reorder step 3
ZONE TAKT
3. Overhead PM Mach…
×5
BOTTLENECK
C/T
1.3 h
C/O
20 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
2 / 1d
OEE
69.1%
i
Insert a step here
+
I
5
0.83 d
Drag to reorder step 4
TRADE TEST
4. Landing Door Sil…
×2
FIFO Lane
C/T
55.5 min
C/O
8 min
Availability
95%
Quality FPY
97.4%
Batch / EPEI
1 / 1d
OEE
90.9%
i
FIFO
Insert a step here
+
I
3
0.50 d
Drag to reorder step 5
HANDOVER
5. Dynamic Overspee…
×2
Continuous Flow
C/T
39.0 min
C/O
5 min
Availability
97%
Quality FPY
98.8%
Batch / EPEI
1 / 1d
OEE
94.8%
i
Insert a step at the end
+
I
4
0.67 d
Finished Goods
OUT
1.00 d
VA 46.5 min
1.33 d
VA 58.5 min
1.83 d
VA 1.3 h
0.83 d
VA 55.5 min
0.50 d
VA 39.0 min
0.67 d
Total Lead Time
6.79 d
VA Time
4.7 h
PCE
9.16%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step