Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Food & Pharma Seamless Polyurethane Screed Floor
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
6.24 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.49%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
6mm Thermal Trowel Pour
15 < 24/day
Limit: changeovers
6mm Thermal Trowel Pour: capacity 15/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.1 min, effective C/T 25.2 min.
Quality (RTY)
86.7%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€211,700
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Polyurethane Floor Re…
4-Part Polyurethane Scr…
2x / week · LT 4d
PRODUCTION CONTROL / ERP
FloorCon ERP
Trade Stacking Clash Delays
CUSTOMER
Food & Beverage Plants
24 rooms/d
Takt: 18.8 min
EDI / Floor Turnkey
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
24
1.00 d
Drag to reorder step 1
STAGING ZONE
1. Diamond Shot-Bla…
×2
FIFO Lane
C/T
11.6 min
C/O
10 min
Availability
96%
Quality FPY
98.4%
Batch / EPEI
10 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
31
1.29 d
Drag to reorder step 2
FIRST FIX
2. Cove Skirting Tr…
×4
Push Flow
C/T
14.6 min
C/O
12 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
7 / 1d
OEE
82.5%
i
Insert a step here
+
I
43
1.79 d
BALANCING
Pull Takt…
Drag to reorder step 3
ZONE TAKT
3. 6mm Thermal Trow…
×5
BOTTLENECK
C/T
20.1 min
C/O
20 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
7 / 1d
OEE
67.6%
i
Insert a step here
+
I
22
0.92 d
Drag to reorder step 4
TRADE TEST
4. Spiked Roller De…
×2
FIFO Lane
C/T
13.9 min
C/O
8 min
Availability
95%
Quality FPY
97.4%
Batch / EPEI
5 / 1d
OEE
84.6%
i
FIFO
Insert a step here
+
I
12
0.50 d
Drag to reorder step 5
HANDOVER
5. 24-Hr Rapid Fork…
×2
Continuous Flow
C/T
9.8 min
C/O
5 min
Availability
97%
Quality FPY
98.8%
Batch / EPEI
4 / 1d
OEE
89.4%
i
Insert a step at the end
+
I
14
0.58 d
Finished Goods
OUT
1.00 d
VA 11.6 min
1.29 d
VA 14.6 min
1.79 d
VA 20.1 min
0.92 d
VA 13.9 min
0.50 d
VA 9.8 min
0.58 d
Total Lead Time
6.24 d
VA Time
1.2 h
PCE
2.49%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step