Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Commercial Prefab Containerized Kitchen Pod
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.63 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
8.26%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Gas, Grease Trap & Suppression Pipe
4 < 6/day
Limit: changeovers
Gas, Grease Trap & Suppression Pipe: capacity 4/day vs demand 6/day. Main limit: changeovers. Raw C/T 1.3 h, effective C/T 1.7 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€609,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
17.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Commercial Ranges & S…
FRP Walls & Extraction …
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
PodERP
Project Job-Shop Push
CUSTOMER
Universities & Event …
6 modules/d
Takt: 1.3 h
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
8
1.33 d
Drag to reorder step 1
BAY 1 FRAME
1. Insulated Steel …
×4
Push Flow
C/T
48.8 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
5 / 2d
OEE
82.8%
i
Insert a step here
+
I
7
1.17 d
Drag to reorder step 2
BAY 2 SHELL
2. FRP Washable Wal…
×4
Push Flow
C/T
54.0 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
3 / 1d
OEE
83.6%
i
Insert a step here
+
I
12
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. Gas, Grease Trap…
×5
BOTTLENECK
C/T
1.3 h
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
2 / 1d
OEE
64.0%
i
Insert a step here
+
I
6
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Stainless Applia…
×4
FIFO Lane
C/T
1.0 h
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
2 / 1d
OEE
82.2%
i
FIFO
Insert a step here
+
I
4
0.67 d
Drag to reorder step 5
DISPATCH YARD
5. Gas Engineer & E…
×2
FIFO Lane
C/T
40.5 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
89.7%
i
Insert a step at the end
+
I
5
0.83 d
Finished Goods
OUT
1.33 d
VA 48.8 min
1.17 d
VA 54.0 min
2.00 d
VA 1.3 h
1.00 d
VA 1.0 h
0.67 d
VA 40.5 min
0.83 d
Total Lead Time
7.63 d
VA Time
4.7 h
PCE
8.26%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step