Multi-Service Prefab Corridor & Riser Rack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.21 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.6 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.91%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
LV Tray, Busbar & Smoke Duct
11 < 18/day
Limit: changeovers
LV Tray, Busbar & Smoke Duct: capacity 11/day vs demand 18/day. Main limit: changeovers. Raw C/T 26.8 min, effective C/T 33.4 min.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€365,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
52.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Grooved Couplings & C…
Strut Channel, Copper &…
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
PrefabMEP ERP
Project Job-Shop Push
CUSTOMER
Hospitals & Data Cent…
18 assemblies/d
Takt: 25.0 min
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
25
1.39 d
Drag to reorder step 1
BAY 1 FRAME
1. BIM Clash-Free F…
×4
Push Flow
C/T
16.3 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
14 / 2d
OEE
82.2%
i
Insert a step here
+
I
22
1.22 d
Drag to reorder step 2
BAY 2 SHELL
2. Insulated Chille…
×4
Push Flow
C/T
18.0 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
9 / 1d
OEE
83.6%
i
Insert a step here
+
I
36
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. LV Tray, Busbar …
×5
BOTTLENECK
C/T
26.8 min
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
7 / 1d
OEE
66.3%
i
Insert a step here
+
I
18
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Hydro Pressure &…
×4
FIFO Lane
C/T
20.0 min
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
5 / 1d
OEE
80.4%
i
FIFO
Insert a step here
+
I
11
0.61 d
Drag to reorder step 5
DISPATCH YARD
5. Wheeled Skid Sit…
×2
FIFO Lane
C/T
13.5 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
5 / 1d
OEE
88.4%
i
Insert a step at the end
+
I
14
0.78 d
Finished Goods
OUT
1.39 d
VA 16.3 min
1.22 d
VA 18.0 min
2.00 d
VA 26.8 min
1.00 d
VA 20.0 min
0.61 d
VA 13.5 min
0.78 d
Total Lead Time
7.21 d
VA Time
1.6 h
PCE
2.91%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step