Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Carousel Automated Hollowcore & Sandwich Wall
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
21.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.09 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.27%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Truss Anchor & Second Pour
29 < 42/day
Limit: downtime
Truss Anchor & Second Pour: capacity 29/day vs demand 42/day. Main limit: downtime. Raw C/T 22.9 min, effective C/T 28.7 min.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€338,100
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
122.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
White Cement & EPS In…
Prestress Wire & Rebar …
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
Precast Plant MES
Project Job-Shop Push
CUSTOMER
Industrial Warehouses
42 parts/d
Takt: 21.4 min
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
59
1.40 d
Drag to reorder step 1
BAY 1 FRAME
1. Laser Plot & Mag…
×4
Push Flow
C/T
13.9 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
34 / 2d
OEE
86.9%
i
Insert a step here
+
I
50
1.19 d
Drag to reorder step 2
BAY 2 SHELL
2. First Wythe & In…
×4
Push Flow
C/T
15.4 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
21 / 1d
OEE
87.7%
i
Insert a step here
+
I
84
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. Truss Anchor & S…
×5
BOTTLENECK
C/T
22.9 min
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
17 / 1d
OEE
73.4%
i
Insert a step here
+
I
42
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Heated Cure Cham…
×4
FIFO Lane
C/T
17.2 min
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
13 / 1d
OEE
86.4%
i
FIFO
Insert a step here
+
I
25
0.60 d
Drag to reorder step 5
DISPATCH YARD
5. Vertical Tilt-Fr…
×2
FIFO Lane
C/T
11.6 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
11 / 1d
OEE
92.0%
i
Insert a step at the end
+
I
34
0.81 d
Finished Goods
OUT
1.40 d
VA 13.9 min
1.19 d
VA 15.4 min
2.00 d
VA 22.9 min
1.00 d
VA 17.2 min
0.60 d
VA 11.6 min
0.81 d
Total Lead Time
7.09 d
VA Time
1.4 h
PCE
1.27%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step