Custom Acoustic Architectural Precast Stair Flight
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.16 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
High-Frequency Vib Concrete Pour
15 < 24/day
Limit: changeovers
High-Frequency Vib Concrete Pour: capacity 15/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.1 min, effective C/T 25.1 min.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€124,320
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
69.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Marble Aggregate & Re…
Self-Leveling Cement & …
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
PrecastERP
Project Job-Shop Push
CUSTOMER
Residential & Office …
24 parts/d
Takt: 18.8 min
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
34
1.42 d
Drag to reorder step 1
BAY 1 FRAME
1. Hydraulic Adjust…
×4
Push Flow
C/T
12.2 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
19 / 2d
OEE
82.4%
i
Insert a step here
+
I
29
1.21 d
Drag to reorder step 2
BAY 2 SHELL
2. Acoustic Nosing …
×4
Push Flow
C/T
13.5 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
12 / 1d
OEE
83.6%
i
Insert a step here
+
I
48
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. High-Frequency V…
×5
BOTTLENECK
C/T
20.1 min
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
10 / 1d
OEE
67.2%
i
Insert a step here
+
I
24
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Diamond Terrazzo…
×4
FIFO Lane
C/T
15.0 min
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
7 / 1d
OEE
80.9%
i
FIFO
Insert a step here
+
I
14
0.58 d
Drag to reorder step 5
DISPATCH YARD
5. Lifting Loop Tes…
×2
FIFO Lane
C/T
10.1 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
6 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
19
0.79 d
Finished Goods
OUT
1.42 d
VA 12.2 min
1.21 d
VA 13.5 min
2.00 d
VA 20.1 min
1.00 d
VA 15.0 min
0.58 d
VA 10.1 min
0.79 d
Total Lead Time
7.16 d
VA Time
1.2 h
PCE
2.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step