80m Clear-Span Roof Structural Steel Truss
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.32 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.31%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
MAG Structural & UT Inspect
8 < 12/day
Limit: downtime
MAG Structural & UT Inspect: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 1.3 h, effective C/T 1.7 h.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€386,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
34.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Structural Steel Sect…
EN-1090 Grade S355 Beams
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
Steel Detailing ERP
Project Job-Shop Push
CUSTOMER
Logistics Warehouses …
12 assemblies/d
Takt: 1.3 h
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
17
1.42 d
Drag to reorder step 1
BAY 1 FRAME
1. CNC Beam Drill &…
×4
Push Flow
C/T
48.8 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
10 / 2d
OEE
87.1%
i
Insert a step here
+
I
14
1.17 d
Drag to reorder step 2
BAY 2 SHELL
2. Shop Jig Fit-Up …
×4
Push Flow
C/T
54.0 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
6 / 1d
OEE
87.7%
i
Insert a step here
+
I
24
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. MAG Structural &…
×5
BOTTLENECK
C/T
1.3 h
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
5 / 1d
OEE
73.6%
i
Insert a step here
+
I
12
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. SA2.5 Blast & In…
×4
FIFO Lane
C/T
1.0 h
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
4 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
7
0.58 d
Drag to reorder step 5
DISPATCH YARD
5. Sequence Bundle …
×2
FIFO Lane
C/T
40.5 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
10
0.83 d
Finished Goods
OUT
1.42 d
VA 48.8 min
1.17 d
VA 54.0 min
2.00 d
VA 1.3 h
1.00 d
VA 1.0 h
0.58 d
VA 40.5 min
0.83 d
Total Lead Time
7.32 d
VA Time
4.7 h
PCE
4.31%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step