Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Gang-Nail Timber Roof Truss Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
7.03 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.38%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hydraulic Gang-Nail Press
87 < 140/day
Limit: changeovers
Hydraulic Gang-Nail Press: capacity 87/day vs demand 140/day. Main limit: changeovers. Raw C/T 3.4 min, effective C/T 4.3 min.
Quality (RTY)
85.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€181,300
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
406.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
C24 Kiln-Dried Pine
Connector Plates & Timb…
Weekly Steel/MEP · LT 8d
PRODUCTION CONTROL / ERP
Timber Truss ERP
Project Job-Shop Push
CUSTOMER
Residential Homebuild…
140 parts/d
Takt: 3.2 min
EDI / Daily Crane Slot
MRP / Weekly Steel/MEP
★ PACEMAKER
IN
Insert a step at the start
+
I
196
1.40 d
Drag to reorder step 1
BAY 1 FRAME
1. 5-Axis Automated…
×4
Push Flow
C/T
2.1 min
C/O
35 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
112 / 2d
OEE
82.4%
i
Insert a step here
+
I
168
1.20 d
Drag to reorder step 2
BAY 2 SHELL
2. Laser Projection…
×4
Push Flow
C/T
2.3 min
C/O
20 min
Availability
94%
Quality FPY
97.6%
Batch / EPEI
70 / 1d
OEE
83.6%
i
Insert a step here
+
I
280
2.00 d
BALANCING
Pre-Built…
Drag to reorder step 3
BAY 3 MEP
3. Hydraulic Gang-N…
×5
BOTTLENECK
C/T
3.4 min
C/O
30 min
Availability
86%
Quality FPY
93.0%
Batch / EPEI
56 / 1d
OEE
66.7%
i
Insert a step here
+
I
140
1.00 d
Drag to reorder step 4
BAY 4 FINISH
4. Auto Stack & Roo…
×4
FIFO Lane
C/T
2.6 min
C/O
15 min
Availability
94%
Quality FPY
97.2%
Batch / EPEI
42 / 1d
OEE
81.2%
i
FIFO
Insert a step here
+
I
84
0.60 d
Drag to reorder step 5
DISPATCH YARD
5. Site Forklift Ba…
×2
FIFO Lane
C/T
104 s
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
35 / 1d
OEE
87.6%
i
Insert a step at the end
+
I
112
0.80 d
Finished Goods
OUT
1.40 d
VA 2.1 min
1.20 d
VA 2.3 min
2.00 d
VA 3.4 min
1.00 d
VA 2.6 min
0.60 d
VA 104 s
0.80 d
Total Lead Time
7.03 d
VA Time
12.1 min
PCE
0.38%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step